loading
Completion
100%
DQE ACM Hub
Renovated existing storage space to new data and fiber hub. Installed temporary generator connection at street-side location.
Completion
100%
DQE Greensburg Hub
Installed a prefabricated building with new generator and fiber feeds; installed air conditioning and ran power from a nearby utility feed.
Completion
100%
DQE Indiana, PA Hub
Craned new modular hub into place, provided raceway and wiring; installed new switchgear and controls.
Completion
100%
DQE Airport Project
Craned new modular hub into place, provided raceway and wiring; installed new switchgear and controls.
Completion
100%
DQE New Castle Project
Framed new partitions, infilled openings to match walls, insulated the new walls and installed a new static dissipative flooring system.
Completion
100%
DQE 4th Ave DC Plant Expansion
Upgraded site to 1800A capacity; provided new spare 200A three phase breakers and 3 new battery strings.
Completion
100%
DQE Uniontown Fiber HUB Site
Upgraded environmental monitoring and security equipment. Framed drywall to deck and set new doors; installed new static dissipative flooring with rubber cove base.
Completion
100%
DQE HUB Fiber Site Security
Upgraded environmental monitoring and security equipment. Provided CAT-5 cables daisy chained between switchboards; included alarm and data gathering panels.
Completion
100%
DQE 4th Ave Systems Upgrade
Install new DC plant and battery strings. Installed automatic transfer switch (ATS) and glycol cooling system to computer room as well as new controls for air conditioning units.
Completion
100%
DQE Pittsburgh Fiber Hub Site
Renovate existing storage space to new data/fiber hub. Installed temporary generator connection at street-side location.