Project Category: DQE Communications

Completion
100%
Renovated existing storage space to new data and fiber hub. Installed temporary generator connection at street-side location.
Completion
100%
Installed a prefabricated building with new generator and fiber feeds; installed air conditioning and ran power from a nearby utility feed.
Completion
100%
Craned new modular hub into place, provided raceway and wiring; installed new switchgear and controls.
Completion
100%
Craned new modular hub into place, provided raceway and wiring; installed new switchgear and controls.
Completion
100%
Framed new partitions, infilled openings to match walls, insulated the new walls and installed a new static dissipative flooring system.
Completion
100%
Upgraded site to 1800A capacity; provided new spare 200A three phase breakers and 3 new battery strings.
Completion
100%
Upgraded environmental monitoring and security equipment. Framed drywall to deck and set new doors; installed new static dissipative flooring with rubber cove base.
Completion
100%
Upgraded environmental monitoring and security equipment. Provided CAT-5 cables daisy chained between switchboards; included alarm and data gathering panels.
Completion
100%
Install new DC plant and battery strings. Installed automatic transfer switch (ATS) and glycol cooling system to computer room as well as new controls for air conditioning units.
Completion
100%
Renovate existing storage space to new data/fiber hub. Installed temporary generator connection at street-side location.