Our Projects

Etzel Engineer & Build Projects

Completion
100%
Standard Farms Cleveland Ohio
Standard Farms first medical marijuana processing facility, open office, locker rooms, extraction room, two loading docks, full security, regulated project.
Completion
100%
Faros Properties
Demolition of existing entryway and construction of a new steel and cedar wood trellis canopy and set of learning steps off of Federal St.
Completion
100%
DQE ACM Hub
Renovated existing storage space to new data and fiber hub. Installed temporary generator connection at street-side location.
Completion
100%
Data Bank Nova Place
Construction of a new data center in Nova Place for Data Bank; includes setting rooftop mechanical equipment and rooftop upgrades.
Completion
100%
Linwood Crest Senior Care
New construction of senior care residential slab-on-grade (SOG) homes
Completion
100%
Life Beaver Senior Care
Build out shell space for senior care center.
Completion
100%
Life Butler Senior Care
Renovation to existing senior care center.
Completion
100%
Iron Mountain Meet Me Room
Expansion of current meet me rooms, the point in the building where diverse fiber and telecoms feeds enter.
Completion
100%
Iron Mountain Data Center SC-12
Build out shell space as data center hall and all required infrastructure
Completion
100%
Iron Mountain Chiller Project
Pre-construction services, pre-purchase of major equipment, project management of core drilling thru mine ceiling to above ground chiller equipment. Included placement of equipment, concrete pads, steel supports and protective bullet proof concrete walls above ground.
Completion
100%
Gaiser Center New Building
Construction of a new administration building for Gaiser Addiction Center.
Completion
100%
Expedient Cleveland Data Center 4
Renovation of shell space and office space into an extension of existing Data Center.
Completion
100%
Giant Eagle Data Center
Addition of enterprise data center and renovation to existing facilities.
Completion
100%
Giant Eagle Truck Wash
New construction of logistics truck wash tunnel and renovation to existing facilities.
Completion
100%
Expedient Dublin Office Renovation
Expansion of office and renovation of restrooms for client tenant
Completion
100%
Expedient Pittsburgh UPS Replacement
UPS replacement of battery back up systems that offer source of continuous power
Completion
100%
Expedient Pittsburgh Dry Cooler Replacement
(8) Dry cooler replacement on rooftop
Completion
100%
Expedient Pittsburgh Office Renovations
Renovation of existing office space and entry
Completion
100%
Expedient Cleveland Office Renovations
Renovation of existing office space for client tenant
Completion
100%
Expedient Baltimore ATS Upgrades
Modification of existing electrical service as required to install (2) new Automatic Transfer Switches and upgrade existing switchgear breakers and system controller
Completion
100%
Expedient Cleveland 151 HVAC Upgrade
Upgrades to the existing HVAC system by replacing computer room air conditions (CRACS) and condensing units.
Completion
100%
Expedient Columbus Data Center Expansion
Renovated existing space for the expansion of the data center, storage space, and office support area.
Completion
100%
Expedient Boston Data Center
Renovated existing data center and office support space.
Completion
100%
Expedient Memphis Data Center
Renovated existing data center and associated office support spaces.
Expedient Indianapolis Yard 2 Expansion
Expanded existing data center (9,000 SF) and modified existing Yard 2, an area of 13,000 square feet; included new electrical and mechanical systems.
Completion
100%
Expedient Cleveland Data Center 3
Renovated existing space for a new data center and support space.
Completion
100%
Expedient Pittsburgh Data Center
Renovated adjoining data center facility to include 8,800 square feet of raised floor data center and 5,200 square feet of support space.
Completion
100%
Expedient Columbus Data Center 2
Data center expansion included modifications to a conference room modifications and renovation of the existing restrooms.
Completion
100%
DQE Greensburg Hub
Installed a prefabricated building with new generator and fiber feeds; installed air conditioning and ran power from a nearby utility feed.
Completion
100%
DQE Indiana, PA Hub
Craned new modular hub into place, provided raceway and wiring; installed new switchgear and controls.
Completion
100%
DQE Airport Project
Craned new modular hub into place, provided raceway and wiring; installed new switchgear and controls.
Completion
100%
DQE New Castle Project
Framed new partitions, infilled openings to match walls, insulated the new walls and installed a new static dissipative flooring system.
Completion
100%
DQE 4th Ave DC Plant Expansion
Upgraded site to 1800A capacity; provided new spare 200A three phase breakers and 3 new battery strings.
Completion
100%
DQE Uniontown Fiber HUB Site
Upgraded environmental monitoring and security equipment. Framed drywall to deck and set new doors; installed new static dissipative flooring with rubber cove base.
Completion
100%
DQE HUB Fiber Site Security
Upgraded environmental monitoring and security equipment. Provided CAT-5 cables daisy chained between switchboards; included alarm and data gathering panels.
Completion
100%
DQE 4th Ave Systems Upgrade
Install new DC plant and battery strings. Installed automatic transfer switch (ATS) and glycol cooling system to computer room as well as new controls for air conditioning units.
Completion
100%
Comcast Head End 1 Improvements
Rework of equipment in head end one (HE1) related to the installation of new battery circuit breaker bay (BDCBB) equipment.
Completion
100%
Comcast Real Time Monitoring Project
Purchase and installation of real time monitoring equipment in several sites in Pittsburgh for Comcast. Real time monitoring allows for fine-tuned observation and control of critical systems.
Completion
100%
Comcast Marion Data Center
Install new 400A manual transfer switch and new 400A roll up tap box; trench and install PVC conduits encased in concrete.
Completion
100%
Comcast Latrobe Data Center Upgrade
New battery enclosure and concrete pad; fire suppression system redesign including hydrogen (H2) detection, new Bard air handlers, integration into existing systems
Completion
100%
Comcast Bethel Park Data Center
New HVAC cooling equipment and enclosures, new lighting and conduit, and new direct current (DC) power equipment.
Completion
100%
Comcast Corliss St. ATS Additions
Installed new 1200A breakers in existing switchgear during work that was performed during safetime hours. Re-fed the existing 400A rectifier panel and installed new 600A rectifier panel, while relocating and installing new light fixtures.
Completion
100%
Comcast Canonsburg Facilities Upgrade
New rooftop units, ductwork, including power upgrades and a new generator and fuel tank. 2-hour fire rated wall assembly interior walls with metal stud framing.
Completion
100%
Comcast Corliss Electric Service Upgrade
Upgraded the electrical service at the Corliss St. Comcast facility, included a new pad and generator as well as wiring into the facility. Critical night work performed with no unplanned outages.
Completion
100%
Comcast Huntingdon
CAT generator replacement and the installation of new power equipment including Automatic Transfer Switches (ATS). We used a roll-up generator and performed controlled shutdowns with a method of procedure (MOP) during a safe time outage.
Completion
100%
Comcast Corliss HE1 DC Plant
Electrical work in three head-end locations at one of Comcast’s largest and most critical data centers. Critical power upgrades, including the installation of (1) 6000A capacity direct current (DC) power plant and (2) 75 kVA inverters. Re-fed all critical equipment in all three headends and there were no unplanned outages.
Completion
100%
Expedient Baltimore HVAC & Office
Replacement and modifications to the existing CRAC units serving the Data Center and UPS rooms. Renovate 4,000 SF of existing office support space.
Completion
100%
Expedient Indianapolis Data Center 2

Expanding existing Data Center (9,000 SF) and modifying existing Yard 2 (13,000 SF) Electrical system in order to lay the ground work associated with a full Data Center Expansion.

Completion
100%
Iron Mountain Kansas City Data Center
Build out shell space as data center hall and all required infrastructure.
Completion
100%
Expedient Boston Office Renovation
Existing office space renovation for Expedient's Boston office. 
Data Center construction by Etzel Engieering and Build
Completion
100%
Expedient Memphis Data Center
Renovation of existing Data Center and support office space.
Completion
75%
Iron Mountain Edison NJ Data Center
Site prep of 821,000 sq/ft data center building in Edison, NJ.
Completion
100%
Expedient Cleveland Diverse Feeds
Provide diversified power feeds from utility to the data center
Completion
100%
Family Pathways Commercial Building
3-story building addition - offices and meeting rooms.
Completion
100%
DQE Pittsburgh Fiber Hub Site
Renovate existing storage space to new data/fiber hub. Installed temporary generator connection at street-side location.
Our Projects

Featured Projects