Project Category: Comcast

Completion
100%
Rework of equipment in head end one (HE1) related to the installation of new battery circuit breaker bay (BDCBB) equipment.
Completion
100%
Purchase and installation of real time monitoring equipment in several sites in Pittsburgh for Comcast. Real time monitoring allows for fine-tuned observation and control of critical systems.
Completion
100%
Install new 400A manual transfer switch and new 400A roll up tap box; trench and install PVC conduits encased in concrete.
Completion
100%
New battery enclosure and concrete pad; fire suppression system redesign including hydrogen (H2) detection, new Bard air handlers, integration into existing systems
Completion
100%
New HVAC cooling equipment and enclosures, new lighting and conduit, and new direct current (DC) power equipment.
Completion
100%
Installed new 1200A breakers in existing switchgear during work that was performed during safetime hours. Re-fed the existing 400A rectifier panel and installed new 600A rectifier panel, while relocating and...
Completion
100%
New rooftop units, ductwork, including power upgrades and a new generator and fuel tank. 2-hour fire rated wall assembly interior walls with metal stud framing.
Completion
100%
Upgraded the electrical service at the Corliss St. Comcast facility, included a new pad and generator as well as wiring into the facility. Critical night work performed with no unplanned...
Completion
100%
CAT generator replacement and the installation of new power equipment including Automatic Transfer Switches (ATS). We used a roll-up generator and performed controlled shutdowns with a method of procedure (MOP)...
Completion
100%
Electrical work in three head-end locations at one of Comcast’s largest and most critical data centers. Critical power upgrades, including the installation of (1) 6000A capacity direct current (DC) power...