Data Point Center Expansion
Mission Critical

Data Point Center Expansion

Maryland

PROJECT OVERVIEW

Design-build contract to expand an existing data center by 5,600 square feet. This project included design services (architectural, electrical, mechanical, fire protection and structural engineering) as well as full construction management services. System installations included 210 tons of air conditioning, FE-25 fire protection, expanding existing commercial power, (2) 1,200 amp electrical services, (2) 800 kW generators and dual 400 kVA UPS units with (4) 225 kVA PDU units all installed in an A/B bus configuration.

PARTNERS

  • LLI Engineering

Download Project Data Sheet

Download the complete project documentation and analysis

PROJECT STATS

$3,400,000
budget
9 months
duration

INTERESTED IN A SIMILAR PROJECT?